The River to River Trail Planning Study is now complete. The objective of the River to River Trail Planning Study is to recommend a preferred route for a non-motorized trail connection from the Kalamazoo County trail system to the Kent County trail system. Specifically, the trail plan looked at a route connecting the existing Kalamazoo River Valley trailhead at D Avenue in Cooper Township north to M-6 connector trail on 68th Street SE in Cutlerville. The complete document can be found at the following link: River to River Trail Planning Study or on the "Other Documents" section of KATS website.
River to River Trail Planning Study
Previous
Previous
Bike Friendly Ideas To Be Presented
Next
Next